<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:g-custom="http://base.google.com/cns/1.0" xmlns:media="http://search.yahoo.com/mrss/" version="2.0">
  <channel>
    <title>Impact Geotechnical Latest news</title>
    <link>https://www.impactgeo.co.uk</link>
    <description>Updates and news from the team at Impact Geotechnical</description>
    <atom:link href="https://www.impactgeo.co.uk/feed/rss2" type="application/rss+xml" rel="self" />
    <image>
      <title>Impact Geotechnical Latest news</title>
      <url>https://irp-cdn.multiscreensite.com/0ee28067/dms3rep/multi/IMG_20191023_131447-01-cf2351ed.jpeg</url>
      <link>https://www.impactgeo.co.uk</link>
    </image>
    <item>
      <title>TFL Step Free Access</title>
      <link>https://www.impactgeo.co.uk/tfl-step-free-access</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  &lt;span&gt;&#xD;
    
          A Challenging Investigation at Leyton Tube Station
         &#xD;
  &lt;/span&gt;&#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Working with Norton Associates, Impact Geotechnical were commissioned to deliver a complex Ground Investigation to a London Underground station which is due for significant remodelling, a capacity upgrade and conversion to a Step Free Access station. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The step free access scheme is part of the Mayor's Pledge to make the London Underground wheelchair accessible, more information can be found at: 
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="https://tfl.gov.uk/travel-information/improvements-and-projects/step-free-access" target="_blank"&gt;&#xD;
      
           https://tfl.gov.uk/travel-information/improvements-and-projects/step-free-access
          &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Spanning three weeks of traffic hours and engineering hours, drilling upon London Underground station Platforms, as well as navigating buried obstructions; our team was able to deliver quality investigation data in a challenging setting and in difficult drilling conditions. Site work involved Cable Percussive Boreholes, Foundation Exposure Trial Pits as well as Modular and Hand Held Windowless Sample Boreholes.
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          As always when undertaking survey works on London Underground infrastructure, access was difficult and Impact employed a mechanical stair climber to move a modular Cable Percussive Drilling Rig into site to complete the drilling work. 
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          This rig can be broken down to facilitate easier access, but still has the capabiliity to drill to 30-40m depth and recover class 1 samples as well as completing insitu SPT tests.
         &#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/0ee28067/dms3rep/multi/IMG_20191221_005343-7E2-01.jpeg" length="5841525" type="image/png" />
      <pubDate>Thu, 06 Aug 2020 15:16:28 GMT</pubDate>
      <guid>https://www.impactgeo.co.uk/tfl-step-free-access</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/0ee28067/dms3rep/multi/IMG_20191221_005343%7E2-01.jpeg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/0ee28067/dms3rep/multi/IMG_20191221_005343-7E2-01.jpeg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>TFL Deep Tube Upgrade</title>
      <link>https://www.impactgeo.co.uk/tfl-deep-tube-upgrade</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  &lt;span&gt;&#xD;
    
                    
          In-depth Investigations in a Unique Environment.
         
                  &#xD;
  &lt;/span&gt;&#xD;
&lt;/h3&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp-cdn.multiscreensite.com/0ee28067/dms3rep/multi/IMG_20200317_092457-01.jpeg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
                  
         Working with Norton Associates, Impact Geotechnical were commissioned to deliver combined Structural and Ground Investigations at three London Underground Substation buildings.
        
                &#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
                      
           Working in the run up to the Covid-19 lock-down, the investigations to the building itself included 
          
                    &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
                      
           diamond coring
          
                    &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
                      
           ,
          
                    &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
                        
            GPR
           
                      &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
                      
           and electromagnetic '
          
                    &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
                      
           Ferroscans
          
                    &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
                        
            ' to floor slabs and walls as well as
           
                      &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
                        
            Pull Out testing
           
                      &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
                        
            and
           
                      &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
                        
            measured surveys
           
                      &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
                      
           of structural elements.
          
                    &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    
                    
          For more information on the scheme please click this link: 
          
                    &#xD;
    &lt;a href="http://content.tfl.gov.uk/pic-20180516-item08-deep-tube-update.pdf"&gt;&#xD;
      
                      
           http://content.tfl.gov.uk/pic-20180516-item08-deep-tube-update.pdf
          
                    &#xD;
    &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/0ee28067/dms3rep/multi/IMG_20200316_121558-01-4d9ddfe1-c9b3e190.jpeg" length="1188177" type="image/png" />
      <pubDate>Thu, 06 Aug 2020 15:10:40 GMT</pubDate>
      <author>impact-geo@outlook.com (Rob Marsh)</author>
      <guid>https://www.impactgeo.co.uk/tfl-deep-tube-upgrade</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/0ee28067/dms3rep/multi/IMG_20200316_121558-01-4d9ddfe1.jpeg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/0ee28067/dms3rep/multi/IMG_20200316_121558-01-4d9ddfe1-c9b3e190.jpeg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Rig Mounted Jet Wash</title>
      <link>https://www.impactgeo.co.uk/rig-mounted-jet-wash</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
                  
         Working at the Rig Wash.....
        
                &#xD;
&lt;/h3&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp-cdn.multiscreensite.com/0ee28067/dms3rep/multi/IMG-20200619-WA0011-01-9c0915c7-007eb45b.jpeg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
                  
         Simple but really effective improvement to our window sampling rig this week, it is now fitted with a 12v mini jet wash.
         
                  &#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
                    
          It has been a great addition for cleaning down after messy sites, washing grit out of the drill tools and cutting down on cross-contamination.
         
                  &#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/0ee28067/dms3rep/multi/IMG_20200618_133249-01.jpeg" length="581601" type="image/jpeg" />
      <pubDate>Thu, 06 Aug 2020 14:57:52 GMT</pubDate>
      <guid>https://www.impactgeo.co.uk/rig-mounted-jet-wash</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/0ee28067/dms3rep/multi/IMG_20200618_133249-01.jpeg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/0ee28067/dms3rep/multi/IMG_20200618_133249-01.jpeg">
        <media:description>main image</media:description>
      </media:content>
    </item>
  </channel>
</rss>
